Skip to content

South Water Street, Beaubien Court to Stetson Avenue, Bridge Reconstruction

South Water Street, Beaubien Court to Stetson Avenue, Bridge Reconstruction

Project Details

Reconstruction of a 50-year-old viaduct ensures safe travel for vehicles and pedestrians on the upper and lower levels of the bridge.

As a member of the Phase I/II engineering services team, Ardmore Roderick provided general engineering services, including traffic counts, roadway geometrics, Americans with Disabilities Act requirements, and preliminary design. This project reconstructed the intermediate-level bridge over Lower South Water Street from Beaubien Court to Stetson Avenue. Support columns for the two buildings pass through the median of both the lower and intermediate levels of South Water Street, which required extensive consideration throughout the design of the project.

Expertise
Transportation
Services Provided
Drainage Design, Highway & Road Design
Location
Chicago, IL
Construction Cost
$5 Million (Est.)

We’re here to help.

Let's Talk

Interested in a Career?

Explore Careers