I-290 Over Salt Creek Phase II Bridge Replacement
Project Details
Ardmore Roderick played a key role in supporting the successful replacement of the I-290 bridge over Salt Creek.
Ardmore Roderick contributed to the Illinois Department of Transportation’s Phase II Engineering services for the I-290 Over Salt Creek Bridge Replacement project. The scope of work included developing contract plans, specifications, and cost estimates for replacing the existing three-span, 102-foot-long bridge. This comprehensive project involved the complete removal and replacement of the bridge structure carrying I-290 over Salt Creek. Ardmore Roderick’s responsibilities included overseeing the preparation of the temporary drainage plan. Temporary drainage was developed adjusting to various stages of construction to accommodate the 25-year storm event.
- Expertise
- Transportation
- Services Provided
- Drainage Design, Highway & Road Design, QA/QC
- Location
- DuPage County, IL
- Construction Cost
- $17.1 Million