Barrington Road IL Route 62 (Algonquin Road) to Central Road Improvements

AR General Hero Banner Transportation

Project Details

Improvements to Barrington Road relieve congestion and reduce the risk of crashes.

Updates to Barrington Road provide two additional lanes of traffic in each direction separated by a median between Mundhank Road and Algonquin Road. Ardmore Roderick, selected as the prime consultant, leads Phase II engineering services for this transformative project, ensuring that the design and execution of improvements advance the infrastructure and serve the community’s needs. As the lead firm, Ardmore Roderick is responsible for preparing plans, specifications, and estimates for the road between Illinois Route 62 and Central Road. A new shared-use path fills a gap in Chicago Metropolitan Agency for Planning’s regional trail system.

Additional improvements modernize and replace traffic signals throughout the corridor and replace the box culvert structure carrying Barrington Road over Poplar Creek. During the Phase II design process, Ardmore Roderick collaborated with the design team to incorporate a pile-supported embankment that strengthens soil stability, realigned the roadway to improve safety, and incorporated walls at strategic locations.

Expertise
Transportation
Services Provided
Highway & Road Design, Structural Engineering, Utility Coordination
Location
Cook County, IL
Construction Cost
$15.3 Million (Est.)